Pages that link to "Item:Q2484361"
From MaRDI portal
The following pages link to Group technology in a hybrid flowshop environment: a case study (Q2484361):
Displayed 12 items.
- Hybrid flowshop scheduling with machine and resource-dependent processing times (Q534872) (← links)
- Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times (Q878582) (← links)
- Modeling realistic hybrid flexible flowshop scheduling problems (Q941540) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- The significance of reducing setup times/setup costs (Q2467248) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant (Q2664430) (← links)
- Non-exhaustive family based dispatching heuristics–exploiting variances of processing and set-up times (Q3163249) (← links)
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (Q5059220) (← links)
- Family-based dispatching: anticipating future jobs (Q5444599) (← links)
- Flowshop-scheduling problems with makespan criterion: a review (Q5466734) (← links)