Pages that link to "Item:Q2642305"
From MaRDI portal
The following pages link to Cyclic hoist scheduling in large real-life electroplating lines (Q2642305):
Displaying 9 items.
- Robust optimization for the cyclic hoist scheduling problem (Q300031) (← links)
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088) (← links)
- Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times (Q337294) (← links)
- Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance (Q342566) (← links)
- A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints (Q693472) (← links)
- Cyclic robot scheduling for 3D printer-based flexible assembly systems (Q829186) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows (Q3163144) (← links)
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times (Q3163706) (← links)