Pages that link to "Item:Q439374"
From MaRDI portal
The following pages link to Production scheduling with alternative process plans (Q439374):
Displaying 10 items.
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames (Q342185) (← links)
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415) (← links)
- Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources (Q6087528) (← links)
- Resource leveling in projects with flexible structures (Q6099408) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)