Pages that link to "Item:Q483213"
From MaRDI portal
The following pages link to The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis (Q483213):
Displaying 8 items.
- The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis (Q483213) (← links)
- An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs (Q972619) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- Approximation results for the two-machine job shop under limited machine availability (Q1788868) (← links)
- On the two-stage hybrid flow shop with dedicated machines (Q3194700) (← links)
- Distributed assembly permutation flow-shop scheduling problem with sequence-dependent set-up times using a novel biogeography-based optimization algorithm (Q6048133) (← links)
- Three-stage assembly flow shop scheduling problem with a fixed maintenance period (Q6542995) (← links)
- On the two-stage assembly flow shop problem (Q6592922) (← links)