Three-stage assembly flow shop scheduling problem with a fixed maintenance period (Q6542995)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Three-stage assembly flow shop scheduling problem with a fixed maintenance period |
scientific article; zbMATH DE number 7852525
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Three-stage assembly flow shop scheduling problem with a fixed maintenance period |
scientific article; zbMATH DE number 7852525 |
Statements
Three-stage assembly flow shop scheduling problem with a fixed maintenance period (English)
0 references
23 May 2024
0 references
scheduling
0 references
assembly flow shop
0 references
maintenance period
0 references
approximation algorithm
0 references
0 references
0 references
0 references
0 references
0.8240814805030823
0 references
0.8146799802780151
0 references
0.8070756196975708
0 references
0.8039969801902771
0 references