Pages that link to "Item:Q552491"
From MaRDI portal
The following pages link to Two-agent single-machine scheduling problems under increasing linear deterioration (Q552491):
Displaying 26 items.
- A tabu method for a two-agent single-machine scheduling with deterioration jobs (Q336450) (← links)
- Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria (Q337198) (← links)
- An investigation on a two-agent single-machine scheduling problem with unequal release dates (Q339650) (← links)
- Single machine scheduling problem with two synergetic agents and piece-rate maintenance (Q350484) (← links)
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties (Q454994) (← links)
- Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent (Q827243) (← links)
- Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities (Q1639885) (← links)
- Parallel-machine scheduling with non-simultaneous machine available time (Q1667812) (← links)
- Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine (Q1694914) (← links)
- A two-agent single-machine scheduling problem with late work criteria (Q1701708) (← links)
- A single-machine two-agent scheduling problem by a branch-and-bound and three simulated annealing algorithms (Q1723459) (← links)
- Two-agent single-machine scheduling with cumulative deterioration (Q2001202) (← links)
- Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices (Q2190797) (← links)
- A just-in-time scheduling problem with two competing agents (Q2228372) (← links)
- Two-agent single-machine scheduling with assignable due dates (Q2250186) (← links)
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems (Q2256205) (← links)
- ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost (Q2284315) (← links)
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems (Q2305016) (← links)
- Two-agent scheduling problems with the general position-dependent processing time (Q2333788) (← links)
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work (Q2359798) (← links)
- Two-agent scheduling of time-dependent jobs (Q2410089) (← links)
- The single-machine total tardiness problem with unequal release times and a linear deterioration (Q2511712) (← links)
- Scheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness Measures (Q2931176) (← links)
- Two-Machine and Two-Agent Flow Shop with Special Processing Times Structures (Q5359060) (← links)
- Single Machine Two-Agent Scheduling with Deteriorating Jobs (Q5506754) (← links)
- Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria (Q6669316) (← links)