Pages that link to "Item:Q614457"
From MaRDI portal
The following pages link to Single-machine batch scheduling minimizing weighted flow times and delivery costs (Q614457):
Displaying 12 items.
- Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs (Q337279) (← links)
- A knowledge-based approach for multi-factory production systems (Q1652022) (← links)
- A branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costs (Q1667779) (← links)
- Integrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding cost (Q1699357) (← links)
- Scheduling and common due date assignment on a single parallel-batching machine with batch delivery (Q1723354) (← links)
- Coordinating multi-location production and customer delivery (Q1936790) (← links)
- Pseudo-polynomial dynamic programming for an integrated due date assignment, resource allocation, production, and distribution scheduling model in supply chain scheduling (Q2009683) (← links)
- Minimizing maximum tardiness and delivery costs with batch delivery and job release times (Q2282368) (← links)
- Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains (Q2355078) (← links)
- Scheduling in a two-stage supply chain with uncertain parameters (Q2987882) (← links)
- Preemptive scheduling in a two-stage supply chain to minimize the makespan (Q3458814) (← links)
- Using genetic algorithm for lot sizing and scheduling problem with arbitrary job volumes and distinct job due date considerations (Q5168017) (← links)