Scheduling and common due date assignment on a single parallel-batching machine with batch delivery (Q1723354)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7025368
Language Label Description Also known as
default for all languages
No label defined
    English
    Scheduling and common due date assignment on a single parallel-batching machine with batch delivery
    scientific article; zbMATH DE number 7025368

      Statements

      Scheduling and common due date assignment on a single parallel-batching machine with batch delivery (English)
      0 references
      0 references
      0 references
      0 references
      19 February 2019
      0 references
      Summary: We consider a single parallel-batching machine scheduling problem with delivery involving both batching scheduling and common due date assignment. The orders are first processed on the single parallel-batching machine and then delivered in batches to the customers. The batching machine can process several orders at the same time. The processing time of a production batch on the machine is equal to the longest processing time of the orders assigned into this batch. A common due date for all the orders in the same delivery batch and a delivery date for each order need to be determined in order to minimize total weighted flow time. We first prove that this problem is NP hard in the strong sense. Two optimal algorithms by using dynamic programming are derived for the two special cases with a given sequence of orders on the machine and a given batching in the production part, respectively.
      0 references

      Identifiers