Pages that link to "Item:Q732893"
From MaRDI portal
The following pages link to Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility (Q732893):
Displaying 5 items.
- A hybrid meta-heuristic algorithm to minimize the number of tardy jobs in a dynamic two-machine flow shop problem (Q1686431) (← links)
- Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lags (Q2018863) (← links)
- Shop scheduling problems with pliable jobs (Q2294890) (← links)
- Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307) (← links)
- Exact solution of the two-machine flow shop problem with three operations (Q2669696) (← links)