Pages that link to "Item:Q850309"
From MaRDI portal
The following pages link to Scheduling with flexible resources in parallel workcenters to minimize maximum completion time (Q850309):
Displayed 6 items.
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility (Q732893) (← links)
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs (Q858442) (← links)
- Minimizing the number of late jobs for the permutation flowshop problem with secondary resources (Q941545) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods (Q2356015) (← links)
- Collaborative Operating Room Planning and Scheduling (Q4599323) (← links)