Pages that link to "Item:Q858340"
From MaRDI portal
The following pages link to Modelling complex assemblies as a queueing network for lead time control (Q858340):
Displaying 9 items.
- Part sojourn time distribution in a two-machine line (Q320643) (← links)
- Longest path analysis in networks of queues: dynamic scheduling problems (Q858339) (← links)
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms (Q869182) (← links)
- Due date assignment for multistage assembly systems (Q1024730) (← links)
- Approximate decomposition methods for the analysis of multicommodity flow routing in generalized queuing networks (Q2255986) (← links)
- A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993) (← links)
- PERFORMANCE EVALUATION OF OPEN QUEUEING NETWORKS WITH FUZZY PARAMETERS (Q3424272) (← links)
- A change point control chart for monitoring the production lead time based on sum of squared ranks (Q5055122) (← links)
- Due-date assignment for multi-server multi-stage assembly systems (Q5252913) (← links)