Pages that link to "Item:Q954930"
From MaRDI portal
The following pages link to Scheduling tests in automotive R\&D projects (Q954930):
Displaying 10 items.
- Exact algorithms for inventory constrained scheduling on a single machine (Q398845) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Approximation algorithms for inventory constrained scheduling on a single machine (Q906561) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Complexity of single machine scheduling subject to nonnegative inventory constraints (Q992655) (← links)
- A priority-rule method for project scheduling with work-content constraints (Q1046055) (← links)
- Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space (Q2197157) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- A local search framework for industrial test laboratory scheduling (Q2241157) (← links)
- Local search approaches for the test laboratory scheduling problem with variable task grouping (Q6090219) (← links)