Pages that link to "Item:Q992569"
From MaRDI portal
The following pages link to A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569):
Displaying 50 items.
- Personnel scheduling and supplies provisioning in emergency relief operations (Q256662) (← links)
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- MIP models for resource-constrained project scheduling with flexible resource profiles (Q297247) (← links)
- A single machine scheduling problem with two-dimensional vector packing constraints (Q319018) (← links)
- An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration (Q319357) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- An approach using SAT solvers for the RCPSP with logical constraints (Q321002) (← links)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (Q322689) (← links)
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (Q322744) (← links)
- Revising history for cost-informed process improvement (Q335888) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Solving software project scheduling problems with ant colony optimization (Q339536) (← links)
- Modelling and solving generalised operational surgery scheduling problems (Q342152) (← links)
- A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames (Q342185) (← links)
- Multiobjective project portfolio selection with fuzzy constraints (Q342776) (← links)
- Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP) (Q363579) (← links)
- The total adjustment cost problem: applications, models, and solution algorithms (Q398909) (← links)
- Resource leveling in a machine environment (Q418090) (← links)
- A game theoretical approach to sharing penalties and rewards in projects (Q421792) (← links)
- Project scheduling with flexible resources: formulation and inequalities (Q443821) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment (Q744657) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models (Q1634073) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- Which fuzzy ranking method is best for maximizing fuzzy net present value? (Q1640504) (← links)
- Survey of quantitative methods in construction (Q1651605) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Total completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate function (Q1652513) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources (Q1667401) (← links)
- Modeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networks (Q1694207) (← links)
- Resource constrained routing and scheduling: review and research prospects (Q1694813) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- Finding an optimal Nash equilibrium to the multi-agent project scheduling problem (Q1707826) (← links)
- Competence-based estimation of activity duration in IT projects (Q1713771) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- Approximate policy iteration for dynamic resource-constrained project scheduling (Q1728303) (← links)
- Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification (Q1733088) (← links)
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis (Q1736812) (← links)