Pages that link to "Item:Q1651546"
From MaRDI portal
The following pages link to The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546):
Displaying 6 items.
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop (Q2004254) (← links)
- A hybrid multi-objective approach for real-time flexible production scheduling and rescheduling under dynamic environment in Industry 4.0 context (Q2668716) (← links)
- Assembly flowshop scheduling problem: speed-up procedure and computational evaluation (Q2670518) (← links)
- A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration (Q5059372) (← links)
- Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times (Q6094376) (← links)