Pages that link to "Item:Q3367040"
From MaRDI portal
The following pages link to Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost (Q3367040):
Displaying 22 items.
- Approximation algorithms for the single-machine scheduling with a period of maintenance (Q279822) (← links)
- Coordination of production and interstage batch delivery with outsourced distribution (Q296709) (← links)
- Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation (Q555434) (← links)
- An improved approximation algorithm for single machine scheduling with job delivery (Q621846) (← links)
- A hybrid two-stage transportation and batch scheduling problem (Q838180) (← links)
- Production scheduling with supply and delivery considerations to minimize the makespan (Q958556) (← links)
- The coordination of transportation and batching scheduling (Q965544) (← links)
- On-line integrated production-distribution scheduling problems with capacitated deliveries (Q1042489) (← links)
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines (Q1617275) (← links)
- Integrated production-distribution scheduling problem with multiple independent manufacturers (Q1666043) (← links)
- Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains (Q2268520) (← links)
- Minimizing maximum tardiness and delivery costs with batch delivery and job release times (Q2282368) (← links)
- Scenario analysis-based decision and coordination in supply chain management with production and transportation scheduling (Q2310974) (← links)
- Single machine scheduling with release dates and job delivery to minimize the makespan (Q2481956) (← links)
- Generalized order acceptance and scheduling problem with batch delivery: models and metaheuristics (Q2669512) (← links)
- Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date (Q2676340) (← links)
- Integrated Job Scheduling with Parallel-Batch Processing and Batch Deliveries (Q2867109) (← links)
- SINGLE MACHINE SCHEDULING WITH JOB DELIVERY TO MINIMIZE MAKESPAN (Q3521606) (← links)
- Two heuristic methods based on decomposition to the integrated multi-agent supply chain scheduling and distribution problem (Q5038175) (← links)
- Using genetic algorithm for lot sizing and scheduling problem with arbitrary job volumes and distinct job due date considerations (Q5168017) (← links)
- A Genetic Algorithm for the Integrated Scheduling of Production and Transport Systems (Q5171845) (← links)
- An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain (Q6091879) (← links)