Integrated production-distribution scheduling problem with multiple independent manufacturers (Q1666043)
From MaRDI portal
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Integrated production-distribution scheduling problem with multiple independent manufacturers |
scientific article |
Statements
Integrated production-distribution scheduling problem with multiple independent manufacturers (English)
0 references
27 August 2018
0 references
Summary: We consider the nonstandard parts supply chain with a public service platform for machinery integration in China. The platform assigns orders placed by a machinery enterprise to multiple independent manufacturers who produce nonstandard parts and makes production schedule and batch delivery schedule for each manufacturer in a coordinate manner. Each manufacturer has only one plant with parallel machines and is located at a location far away from other manufacturers. Orders are first processed at the plants and then directly shipped from the plants to the enterprise in order to be finished before a given deadline. We study the above integrated production-distribution scheduling problem with multiple manufacturers to maximize a weight sum of the profit of each manufacturer under the constraints that all orders are finished before the deadline and the profit of each manufacturer is not negative. According to the optimal condition analysis, we formulate the problem as a mixed integer programming model and use CPLEX to solve it.
0 references
0 references
0 references