The following pages link to (Q3806968):
Displaying 10 items.
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times (Q850231) (← links)
- Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process (Q1278196) (← links)
- A hybrid two-stage flowshop with part family, batch production, major and minor set-ups (Q1291587) (← links)
- Heuristics for the flow line problem with setup costs (Q1303708) (← links)
- Scheduling a two-stage hybrid flowshop with separable setup and removal times (Q1333533) (← links)
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (Q1339130) (← links)
- Scheduling under machine breakdown in a continuous process industry (Q1765549) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- An approximate solution of the flow-shop problem with sequence dependent setup times (Q3035126) (← links)