AFSCN scheduling: how the problem and solution have evolved
From MaRDI portal
Recommendations
- Scheduling space-ground communications for the air force satellite control network
- Scheduling space-ground communications for the air force satellite control network
- High-performance technique for satellite range scheduling
- Deux problèmes d'ordonnancement en télécommunications par satellite
- Automating Air Force Satellite Control Network (AFSCN) scheduling
Cites work
- Approximating the throughput of multiple machines in real-time scheduling
- scientific article; zbMATH DE number 5542185 (Why is no real title available?)
- scientific article; zbMATH DE number 4104743 (Why is no real title available?)
- scientific article; zbMATH DE number 1305705 (Why is no real title available?)
- scientific article; zbMATH DE number 1062113 (Why is no real title available?)
- scientific article; zbMATH DE number 194544 (Why is no real title available?)
- On the \(k\)-coloring of intervals
- On the approximability of an interval scheduling problem
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling jobs with fixed start and end times
- Scheduling space-ground communications for the air force satellite control network
- Solving over-constrained satellite remote sensing problems
- The impact of approximate evaluation on the performance of search algorithms for warehouse scheduling
- Three scheduling algorithms applied to the Earth observing systems domain
Cited in
(11)- High-performance technique for satellite range scheduling
- A hybrid genetic algorithm for satellite image downlink scheduling problem
- Automating Air Force Satellite Control Network (AFSCN) scheduling
- Three scheduling algorithms applied to the Earth observing systems domain
- Deux problèmes d'ordonnancement en télécommunications par satellite
- Understanding algorithm performance on an oversubscribed scheduling application
- Evaluation of struggle strategy in genetic algorithms for ground stations scheduling problem
- Scheduling satellite launch missions: an MILP approach
- Scheduling space-ground communications for the air force satellite control network
- Scheduling space-ground communications for the air force satellite control network
- Graph colouring approaches for a satellite range scheduling problem
This page was built for publication: AFSCN scheduling: how the problem and solution have evolved
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2473179)