A Polynomial Approximation Scheme for a Constrained Flow-Shop Scheduling Problem
From MaRDI portal
Recommendations
- A polynomial approximation scheme for problem \(F2/r_ j/C_{\text{max}}\)
- Efficient approximation schemes for scheduling problems with release dates and delivery times
- PTAS for a two-machine flow-shop scheduling problem with release dates and transportation times delay
- A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint
- A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates.
Cited in
(15)- Two-machine flowshop scheduling with availability constraints
- Fast algorithms to minimize the makespan or maximum lateness in the two-machine flow shop with release times.
- Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
- A polynomial-time algorithm for the two-machine unit-time release-date job-shop schedule-length problem
- A polynomial approximation scheme for problem \(F2/r_ j/C_{\text{max}}\)
- Two-machine flowshop scheduling in a physical examination center
- An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times
- An approximability result of the multi-vehicle scheduling problem on a path with release and handling times
- scientific article; zbMATH DE number 1731178 (Why is no real title available?)
- A Fully Polynomial Approximation Scheme for Single-Product Scheduling in a Finite Capacity Facility
- scientific article; zbMATH DE number 4170628 (Why is no real title available?)
- PTAS for a two-machine flow-shop scheduling problem with release dates and transportation times delay
- A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates.
- Polynomial-time approximation schemes for scheduling problems with time lags
- Optimal control of a two-server flow-shop network
This page was built for publication: A Polynomial Approximation Scheme for a Constrained Flow-Shop Scheduling Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4294730)