A new heuristic for open shop total completion time problem
From MaRDI portal
Recommendations
- Constructive heuristic algorithms for the open shop problem
- A heuristic algorithm for open-shop scheduling problems with a single server
- Open shop scheduling with makespan and total completion time criteria
- On the asymptotic optimality and improved strategies of SPTB heuristic for open-shop scheduling problem
- Heuristic constructive algorithms for open shop scheduling to minimize mean flow time
Cites work
- Asymptotic optimality in probability of a heuristic schedule for open shops with job overlaps
- Heuristic constructive algorithms for open shop scheduling to minimize mean flow time
- scientific article; zbMATH DE number 5345854 (Why is no real title available?)
- scientific article; zbMATH DE number 2114378 (Why is no real title available?)
- Open shop problems with unit time operations
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling the Open Shop to Minimize Mean Flow Time
- The total completion time open shop scheduling problem with a given sequence of jobs on one machine
Cited in
(14)- Constructive heuristic algorithms for the open shop problem
- The total completion time open shop scheduling problem with a given sequence of jobs on one machine
- New efficient heuristics for scheduling open shops with makespan minimization
- Retracted article: Multi-objective open shop scheduling by considering human error and preventive maintenance
- Heuristic constructive algorithms for open shop scheduling to minimize mean flow time
- A new particle swarm optimization for multi-objective open shop scheduling
- Open shop problem to minimize the total weighted completion time
- scientific article; zbMATH DE number 1910710 (Why is no real title available?)
- scientific article; zbMATH DE number 938619 (Why is no real title available?)
- On the asymptotic optimality and improved strategies of SPTB heuristic for open-shop scheduling problem
- An heuristic approach for solving OSSP with a objective of minimizing total completion time and resource idleness
- Scheduling open shops with parallel machines to minimize total completion time
- The LPT heuristic for minimizing total load on a proportionate openshop
- A contribution and new heuristics for open shop scheduling
This page was built for publication: A new heuristic for open shop total completion time problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q967860)