A new model for path planning with interval data
From MaRDI portal
Recommendations
Cites work
- A branch and bound algorithm for the robust shortest path problem with interval data.
- Approximation Schemes for the Restricted Shortest Path Problem
- Arriving on time
- Least expected time paths in stochastic, time-varying transportation networks
- On the online shortest path problem with limited arc cost dependencies
- On the robust shortest path problem.
- Robust discrete optimization and its applications
- Shortest Paths in Probabilistic Graphs
- The computational complexity of the relative robust shortest path problem with interval data
- The shortest path problem with two objective functions
- The shortest route problem with constraints
Cited in
(9)- Min-max controllable risk problems
- On the Minimum Risk-Sum Path Problem
- Min‐sum controllable risk problems with concave risk functions of the same value range
- Deterministic risk control for cost-effective network connections
- Path planning using intervals and graphs
- Dynamic shortest path problems: hybrid routing policies considering network disruptions
- Maximum excess dominance: identifying impractical solutions in linear problems with interval coefficients
- Exact approaches for solving robust prize-collecting Steiner tree problems
- Reliably Safe Path Planning Using Interval Analysis
This page was built for publication: A new model for path planning with interval data
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1000974)