A parallel implementation of unscheduled flow control in interconnected power systems
Summary: The unscheduled power flow problem needs to be minimized or controlled as soon as possible in a deregulated power system since the transmission systems are mostly operated at their power-carrying limits or very close to it. The time spent for simulations to determine the current states of all the system and control variables of the interconnected power system is important. Taking necessary action in case of any failure of equipment or any other occurrence of an undesired situation could be critical. Using supercomputing facilities and parallel computing techniques together decreases the computation time greatly. In this study, a parallel implementation of a multiobjective optimization approach based on both genetic algorithms and fuzzy decision making to manage unscheduled flows is presented. Parallel computation techniques are applied using supercomputers (high-performance computers). The proposed method is applied to the IEEE 300 bus test system. Two different cases for some parameters of GA are considered to see the power of parallel computation technique. Then the simulation results are presented.
- scientific article; zbMATH DE number 2062962
- scientific article; zbMATH DE number 18250
- scientific article; zbMATH DE number 1567255
- Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems
- Dynamic optimal reactive power dispatch based on parallel particle swarm optimization algorithm
- Efficient parallel genetic algorithms: Theory and practice
- scientific article; zbMATH DE number 41471 (Why is no real title available?)
- scientific article; zbMATH DE number 108393 (Why is no real title available?)
- scientific article; zbMATH DE number 839542 (Why is no real title available?)
- scientific article; zbMATH DE number 867338 (Why is no real title available?)
- Introduction to evolutionary computing
- Introduction to Genetic Algorithms
This page was built for publication: A parallel implementation of unscheduled flow control in interconnected power systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1954724)