A single machine group scheduling problem with due date assignment and position-dependent costs
From MaRDI portal
Recommendations
- Common due-window assignment and group scheduling with position-dependent processing times
- Group scheduling on a single machine with due date assignment and learning effects
- Single machine scheduling and due date assignment with positionally dependent processing times
- Single machine scheduling problem with multiple due windows assignment in a group technology
- On optimal due date assignment without restriction and resource allocation in group technology scheduling
Cites work
- A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties
- A comprehensive review of flowshop group scheduling literature
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Due-window assignment scheduling in the proportionate flow shop setting
- Group maintenance scheduling for two-component systems with failure interaction
- scientific article; zbMATH DE number 1634827 (Why is no real title available?)
- Optimal due date assignment and resource allocation in a group technology scheduling environment
- Optimal restricted due date assignment in scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Single-machine group scheduling with processing times dependent on position, starting time and allotted resource
- Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
Cited in
(5)- Optimal policies for minimizing total job completion times and deviations from common due dates in unrelated parallel machine scheduling
- Study on single-machine group scheduling with convex resource allocations and different due-date assignments
- No-idle flow shop scheduling with deteriorating jobs and common due date under dominating machines
- Single machine group scheduling jobs with resource allocations subject to unrestricted due date assignments
- Optimal due date assignment in a single machine group technology scheduling environment with learning effect
This page was built for publication: A single machine group scheduling problem with due date assignment and position-dependent costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6542871)