A time-decomposition method for sequence-dependent setup scheduling under pressing demand conditions
From MaRDI portal
Recommendations
- Maximum principle-based methods for production scheduling with partially sequence-dependent setups
- Optimal Flow Control for Continuous‐time Scheduling in Flexible Manufacturing Systems
- An optimal control model for continuous time production and setup scheduling
- A maximum principle based combined method for scheduling in a flexible manufacturing system
- Optimal scheduling in parallel and serial manufacturing systems via the maximum principle
Cited in
(6)- Decomposition methods for reentrant flow shops with sequence-dependent setup times
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
- Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approach
- Maximum principle-based methods for production scheduling with partially sequence-dependent setups
- Optimal Flow Control for Continuous‐time Scheduling in Flexible Manufacturing Systems
- Continuous-Time Models For Production Scheduling In Constrained Subcontracting Conditions
This page was built for publication: A time-decomposition method for sequence-dependent setup scheduling under pressing demand conditions
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4507111)