Optimal scheduling in parallel and serial manufacturing systems via the maximum principle
From MaRDI portal
(Redirected from Publication:1580435)
Recommendations
- Optimal scheduling of parallel machines with constrained resources
- A maximum principle based combined method for scheduling in a flexible manufacturing system
- Maximum principle-based methods for production scheduling with partially sequence-dependent setups
- Optimal production and setup scheduling: A one-machine, two-product system
- Scheduling concurrent production over a finite planning horizon: Polynomially solvable cases
Cited in
(7)- Scheduling one-part-type serial manufacturing system under periodic demand: A solvable case
- A maximum principle based combined method for scheduling in a flexible manufacturing system
- Optimal scheduling of parallel machines with constrained resources
- Maximum principle-based methods for production scheduling with partially sequence-dependent setups
- A time-decomposition method for sequence-dependent setup scheduling under pressing demand conditions
- scientific article; zbMATH DE number 5049922 (Why is no real title available?)
- Scheduling concurrent production over a finite planning horizon: Polynomially solvable cases
This page was built for publication: Optimal scheduling in parallel and serial manufacturing systems via the maximum principle
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1580435)