Agent-based scheduling in production systems
From MaRDI portal
Recommendations
Cited in
(19)- Coordination of multiple agents for production management
- Process selection and sequencing in a two-agents production system
- Parallel machines scheduling with machine preference via agent-based approach
- scientific article; zbMATH DE number 1670581 (Why is no real title available?)
- scientific article; zbMATH DE number 1708128 (Why is no real title available?)
- Multi-agent based beam search for intelligent production planning and scheduling
- Manufacturing system scheduling based on multi-agent cooperation game
- Timing constraints' optimization of reserved tasks in the distributed shop-floor scheduling
- An adaptive production control system utilizing agent technology
- Agent-based multiple shop floor manufacturing scheduler
- scientific article; zbMATH DE number 2090916 (Why is no real title available?)
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
- Distributed production planning and control agent-based system
- Self-adaptive dynamic scheduling of virtual production systems
- Multi-agent-based approach to solve part selection and task allocation problem in flexible manufacturing systems
- scientific article; zbMATH DE number 5039508 (Why is no real title available?)
- scientific article; zbMATH DE number 5043330 (Why is no real title available?)
- An agent-based approach for scheduling multiple machines
- Production optimization for agents of differing work rates
This page was built for publication: Agent-based scheduling in production systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4415991)