Manufacturing system scheduling based on multi-agent cooperation game
From MaRDI portal
Recommendations
- How to schedule a job shop problem through agent cooperation
- Agent-based scheduling in production systems
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
- Autonomous agents applied to manufacturing scheduling problems: A negotiation-based heuristic approach
- An inter-cell scheduling approach based on negotiation of multi-agent coalitions
Cited in
(7)- Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants
- How to schedule a job shop problem through agent cooperation
- Scheduling of production using the multi-agent approach by hierarchical structure
- Cooperative system design in scheduling
- Agent-based scheduling in production systems
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
- An inter-cell scheduling approach based on negotiation of multi-agent coalitions
This page was built for publication: Manufacturing system scheduling based on multi-agent cooperation game
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3538462)