Algorithm AS 258: Average Run Lengths for Cumulative Sum Schemes
From MaRDI portal
Cited in
(7)- Computation of the ARL for CUSUM-\(S^2\) schemes
- AS 258
- Shewhart Revisited
- Steady-state average run length(s): Methodology, formulas, and numerics
- The computation of average run length and average time to signal: an overview
- Number of Replications Required in Control Chart Monte Carlo Simulation Studies
- An accurate algorithm to compute the run length probability distribution, and its convolutions, for a cusum chart to control normal mean
This page was built for publication: Algorithm AS 258: Average Run Lengths for Cumulative Sum Schemes
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3201234)