Allocation of Control Points in Stochastic Dynamic-Programming Models

From MaRDI portal





Stochastic production planning problems are considered where a given quantity has to be produced in at most N lots within a given total time T. The lot sizes and the production intervals may be chosen in order to optimize given objectives. Under very restrictive (and unrealistic) assumptions it is proved - as the main result of the paper - that minimal costs are achieved independent of the interval lengths. These assumptions include (1) that the production costs and the random output of a single lot depend only on the planned lot size and not on the production rate and (2) that there are no costs of idle times. The second part of the paper on ``an alternative (heuristic) approach is obscure since neither the objectives nor the stochastic structure nor the ``solution by ``heuristic rules are stated completely or correctly. In the final discussion a hypothesis on decreasing production intervals is formulated.











This page was built for publication: Allocation of Control Points in Stochastic Dynamic-Programming Models

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3806966)