An SA/TS mixture algorithm for the scheduling tardiness problem
From MaRDI portal
Recommendations
Cites work
- A heuristic for the single machine tardiness problem
- A user's guide to tabu search
- An Evaluation of Flow Shop Sequencing Heuristics
- Applying tabu search to the job-shop scheduling problem
- Convergence of an annealing algorithm
- Equation of state calculations by fast computing machines
- Focused Scheduling in Proportionate Flowshops
- scientific article; zbMATH DE number 3485481 (Why is no real title available?)
- Optimization by simulated annealing
- Optimization by Simulated Annealing: An Experimental Evaluation; Part I, Graph Partitioning
- Restricted neighborhood in the tabu search for the flowshop problem
- Single Machine Earliness-Tardiness Scheduling Problems Using the Equal–Slack Rule
- Some efficient heuristic methods for the flow shop sequencing problem
- Some experiments with simulated annealing for coloring graphs
- Tabu Search—Part I
- Tabu Search—Part II
- Weighted Tardiness Single Machine Scheduling with Proportional Weights
Cited in
(6)- A composite heuristic for the single machine early/tardy job scheduling problem.
- Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
- Modelling and heuristics of FMS scheduling with multiple objectives
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
- Two-agent proportionate flowshop scheduling with deadlines: polynomial-time optimization algorithms
- Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
This page was built for publication: An SA/TS mixture algorithm for the scheduling tardiness problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1266621)