Modelling and heuristics of FMS scheduling with multiple objectives
From MaRDI portal
Publication:2566932
Recommendations
- Heuristics for scheduling in flowshop with multiple objectives
- Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment
- scientific article; zbMATH DE number 7722
- A global MILP model for FMS scheduling
- A loading and dispatching problem in a random flexible manufacturing system
Cites work
- A Computational Study of the Job-Shop Scheduling Problem
- A genetic algorithm for the job shop problem
- A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
- A new lower bound for the job-shop scheduling problem
- An Algorithm for Solving the Job-Shop Problem
- An exchange heuristic imbedded with simulated annealing for due-dates job-shop scheduling
- An SA/TS mixture algorithm for the scheduling tardiness problem
- Applying tabu search to the job-shop scheduling problem
- scientific article; zbMATH DE number 1062113 (Why is no real title available?)
- Incorporating preference information into multi-objective scheduling
- Intelligent dispatching for flexible manufacturing
- Job Shop Scheduling by Simulated Annealing
- Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment
- Modelling and scheduling of a flexible manufacturing system
- Multiple attribute decision making. Methods and applications. A state-of- the-art survey
- The classification of FMS scheduling problems
- The job shop scheduling problem: Conventional and new solution techniques
- The Shifting Bottleneck Procedure for Job Shop Scheduling
Cited in
(19)- A global MILP model for FMS scheduling
- Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach
- A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment
- Flexible job shop scheduling problem for parallel batch processing machine with compatible job families
- Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times
- A review of some issues and identification of some barriers in the implementation of FMS
- Approximation schemes for bi-objective combinatorial optimization and their application to the TSP with profits
- Evaluation of mathematical models for flexible job-shop scheduling problems
- A competitive neural network approach to multi-objective FMS scheduling
- Two Heterarchical Multiagent Approaches for FMS Dynamic Scheduling
- Fuzzy inference-based multiple criteria FMS scheduling
- General heuristic procedures and solution strategies for FMS scheduling
- A Multi-Fidelity Model Approach for Simultaneous Scheduling of Machines and Vehicles in Flexible Manufacturing Systems
- Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment
- Loading and scheduling for flexible manufacturing systems with controllable processing times
- A united search particle swarm optimization algorithm for multiobjective scheduling problem
- Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project
- Mathematical models for job-shop scheduling problems with routing and process plan flexibility
- A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem
This page was built for publication: Modelling and heuristics of FMS scheduling with multiple objectives
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2566932)