A global MILP model for FMS scheduling
From MaRDI portal
Publication:1278123
DOI10.1016/S0377-2217(96)00055-0zbMath0917.90171OpenAlexW2011151328MaRDI QIDQ1278123
Publication date: 22 February 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00055-0
Related Items (9)
Evaluation of mathematical models for flexible job-shop scheduling problems ⋮ Solving the flexible job shop scheduling problem with sequence-dependent setup times ⋮ Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times ⋮ Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project ⋮ Time-optimal coordination of flexible manufacturing systems using deterministic finite automata and mixed integer linear programming ⋮ Using genetic algorithms (GA) and a coloured timed Petri net (CTPN) for modelling the optimization-based schedule generator of a generic production scheduling system ⋮ Scheduling flexible manufacturing cells using Tabu Search ⋮ Flexible job shop scheduling problem for parallel batch processing machine with compatible job families ⋮ An MILP for scheduling problems in an FMS with one vehicle
Cites Work
- Unnamed Item
- Modelling and scheduling of a flexible manufacturing system
- A mixed integer program for loading and scheduling multiple flexible manufacturing cells
- New trends in machine scheduling
- A branch-and-cut algorithm for vehicle routing problems
- Effects of loading and routeing decisions on performance of flexible manufacturing systems
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- A loading and dispatching problem in a random flexible manufacturing system
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
- On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing Problem
- The classification of FMS scheduling problems
- Solving Airline Crew Scheduling Problems by Branch-and-Cut
This page was built for publication: A global MILP model for FMS scheduling