Modelling and scheduling of a flexible manufacturing system

From MaRDI portal
Publication:919990

DOI10.1016/0377-2217(90)90183-CzbMath0707.90042OpenAlexW2068758097MaRDI QIDQ919990

Tadeusz J. Sawik

Publication date: 1990

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(90)90183-c




Related Items (16)



Cites Work


This page was built for publication: Modelling and scheduling of a flexible manufacturing system