An optimal production flow control problem with impulsive demand
Let the state \(x\) be the cumulative difference between the production input and the known demand modeled by a set of impulses over a finite time horizon for a reliable single machine cell with finite capacity. Pontryagin's extremum principle is applied for a quadratic cost in the state. For a single demand, using the continuity of the adjoint variable (the impulse affects directly the state not the adjoint variable), and enough control to satisfy the demand, switching formulas which set on the machine at maximal rate or set it off are derived. For multiple demands, a procedure for merging overlapping time intervals where the machines are on, is indicated. The procedure is modified so that the boundary conditions are satisfied.
- An optimal production flow control problem with piecewise constant demand
- An impulse control problem of a production model with interruptions to follow stochastic demand
- scientific article; zbMATH DE number 2157478
- Optimal control approach to production systems with inventory-level-dependent demand
- Optimal control of a production-inventory system with customer impatience
- Optimal control of production inventory systems with inventory-level-dependent demand
- scientific article; zbMATH DE number 5230252
- Optimal inflow control of production systems with finite buffers
- An Optimal Stochastic Production Planning Problem with Randomly Fluctuating Demand
- An optimal production flow control problem with piecewise constant demand
- Dynamic setup scheduling and flow control in manufacturing systems
- scientific article; zbMATH DE number 3167340 (Why is no real title available?)
- Manufacturing flow control and preventing maintenance: a stochastic control approach
- Optimal control of a production system with periodic maintenance
- Optimal control of production rate in a failure prone manufacturing system
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Turnpike sets in stochastic manufacturing systems with finite time horizon
This page was built for publication: An optimal production flow control problem with impulsive demand
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1381747)