Approximation results on resource leveling problems
From MaRDI portal
Cites work
- A common approximation framework for early work, late work, and resource leveling problems
- A metaheuristic solution approach for the time-constrained project scheduling problem
- An Almost-Optimal Algorithm for the Assembly Line Scheduling Problem
- An effective heuristic for project scheduling with resource availability cost
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Exponential Time Complexity of the Permanent and the Tutte Polynomial
- Load balancing: the long road from theory to practice
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Mixed-integer linear programming for resource leveling problems
- On Integer Programming, Discrepancy, and Convolution
- Optimal project duration for resource leveling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Resource leveling in a machine environment
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
- Ruling Out PTAS for Graph Min‐Bisection, Dense k‐Subgraph, and Bipartite Clique
This page was built for publication: Approximation results on resource leveling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6930239)