Asset replacement for an urban railway using a modified two-cycle replacement model
From MaRDI portal
Recommendations
- Multi-objective model for optimizing railway infrastructure asset renewal
- A Markovian model as a tool for optimizing railway track maintenance
- An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems
- Maintenance routing for train units: the interchange model
- A numerical model for the cyclic deterioration of railway tracks
- Optimization models for multi-period railway rolling stock assignment
- The optimization of the maintenance interventions for railway lines by the use of a Markovian model: analysis of a case study.
- Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule
- An optimization model for freight transport using urban rail transit
- Models for railway track allocation
Cited in
(3)
This page was built for publication: Asset replacement for an urban railway using a modified two-cycle replacement model
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5429825)