Complexity of Scheduling Shops with No Wait in Process
From MaRDI portal
Cited in
(37)- Complete local search with limited memory algorithm for no-wait job shops to minimize makespan
- Some no-wait shops scheduling problems: Complexity aspect
- Minimizing expected makespan in a two-machine stochastic open shop with Poisson arrival
- The complexity of scheduling jobs in repetitive manufacturing systems
- Two-stage no-wait scheduling models with setup and removal times separated
- Approximative procedures for no-wait job shop scheduling.
- Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
- Two machine flow shop scheduling problem with no wait in process: Controllable machine speeds
- Lot sizing in a no-wait flow shop
- On a scheduling problem in a robotized analytical system
- A two-machine no-wait flow shop problem with two competing agents
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches
- Four decades of research on the open-shop scheduling problem to minimize the makespan
- Coupled task scheduling with exact delays: literature review and models
- On Eulerian extensions and their application to no-wait flowshop scheduling
- No-wait job shop scheduling: tabu search and complexity of subproblems
- An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops
- An evolutionary approach to rehabilitation patient scheduling: A case study
- An enhanced timetabling procedure for the no-wait job shop problem: a complete local search approach
- The two-machine no-wait general and proportionate open shop makespan problem
- The proportionate two-machine no-wait job shop scheduling problem
- The open shop scheduling problem
- SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
- FREIGHT TRAIN ROUTING AND SCHEDULING IN A PASSENGER RAIL NETWORK: COMPUTATIONAL COMPLEXITY AND THE STEPWISE DISPATCHING HEURISTIC
- scientific article; zbMATH DE number 1279216 (Why is no real title available?)
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- NP-hardness of compact scheduling in simplified open and flow shops.
- Computational complexity and algorithms for two scheduling problems under linear constraints
- On the NP-hardness of two scheduling problems under linear constraints
- Reentrant open shop scheduling problem with time lags and no-wait constraints
- Fifty years of research in scheduling -- theory and applications
- On the inapproximability of two-machine open shop scheduling with exact delays
- The impact of missing operations on the flow shop: permutation \textit{vs}. non permutation modes
- Inapproximability results for no-wait job shop scheduling.
- Scheduling two-machine no-wait open shops to minimize makespan
- On the inapproximability of two-machine open shop scheduling with exact delays
- A pseudo-polynomial algorithm for a two-machine no-wait job-shop scheduling problem
This page was built for publication: Complexity of Scheduling Shops with No Wait in Process
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3880561)