Controlling delivery performance in semiconductor manufacturing using Look Ahead Batching
From MaRDI portal
Recommendations
- Dynamic control of the batch processor in a serial-batch processor system with mean tardiness performance
- Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook
- A new dynamic look-ahead scheduling procedure for batching machines
- Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
- Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system
Cites work
- Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
- Efficient scheduling algorithms for a single batch processing machine
- scientific article; zbMATH DE number 3945836 (Why is no real title available?)
- Optimal control of batch service queues
- Scheduling a single batch processing machine with non-identical job sizes
- Sequencing with Earliness and Tardiness Penalties: A Review
- The use of upstream and downstream information in scheduling semiconductor batch operations
Cited in
(10)- Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook
- Dynamic control of the batch processor in a serial-batch processor system with mean tardiness performance
- Controlling delivery and energy performance of parallel batch processors in dynamic mould manufacturing
- Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories
- Control methods for dynamic time-based manufacturing under customized product lead times
- The use of upstream and downstream information in scheduling semiconductor batch operations
- Real-time batch sequencing using arrival time control algorithm
- Comparison and evaluation of lot-to-order matching policies for a semiconductor assembly and test facility
- scientific article; zbMATH DE number 2159123 (Why is no real title available?)
- A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival
This page was built for publication: Controlling delivery performance in semiconductor manufacturing using Look Ahead Batching
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5438632)