Expected cost for continuous sampling plans
From MaRDI portal
Recommendations
Cites work
- A Sampling Inspection Plan for Continuous Production
- Average outgoing quality of CSP-C continuous sampling plan under short run production processes
- Economic design of continuous sampling plan under linear inspection cost
- scientific article; zbMATH DE number 3140887 (Why is no real title available?)
- The Effect of Short Production Runs on CSP-1
Cited in
(6)- Optimal scheme for process quality and cost control by integrating a continuous sampling plan and the process yield index
- Sampling on successive occasions to re-estimate future asset management expenditure
- CSP-1 plan applied in economic manufacturing quantity model
- Economic design of continuous sampling plan under linear inspection cost
- scientific article; zbMATH DE number 1529312 (Why is no real title available?)
- scientific article; zbMATH DE number 2112521 (Why is no real title available?)
This page was built for publication: Expected cost for continuous sampling plans
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3098932)