Fast computational procedure for solving multi-item single-machine lot scheduling optimzation problems
From MaRDI portal
Recommendations
- A fast computational procedure to solve the multi-item single machine lot scheduling optimization problem: The average cost case
- scientific article; zbMATH DE number 3947982
- A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem
- The discrete lot-sizing and scheduling problem
- The single-item discrete lotsizing and scheduling problem: Optimization by linear and dynamic programming
Cites work
- scientific article; zbMATH DE number 433058 (Why is no real title available?)
- scientific article; zbMATH DE number 53999 (Why is no real title available?)
- scientific article; zbMATH DE number 3505708 (Why is no real title available?)
- scientific article; zbMATH DE number 3581179 (Why is no real title available?)
- scientific article; zbMATH DE number 3365084 (Why is no real title available?)
- Approximate solutions of the Bellman equation of deterministic control theory
- Approximation schemes for viscosity solutions of Hamilton-Jacobi equations
- Discrete maximum principle for finite-difference operators
- Hamilton-Jacobi Equations with State Constraints
- On Deterministic Control Problems: an Approximation Procedure for the Optimal Cost II. The Nonstationary Case
- On unbounded solutions of Bellman's equation associated with optimal switching control problems with state constraints
- Optimal Switching for Ordinary Differential Equations
- Some Estimates for Finite Difference Approximations
Cited in
(4)- scientific article; zbMATH DE number 433058 (Why is no real title available?)
- Multi-Item Single-Machine Scheduling with Material Supply Constraints
- A SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM WITH CONSIDERATION OF PRODUCT-DEPENDENT TRANSPORTATION
- A fast computational procedure to solve the multi-item single machine lot scheduling optimization problem: The average cost case
This page was built for publication: Fast computational procedure for solving multi-item single-machine lot scheduling optimzation problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1357521)