Flow Management in Flexible Manufacturing Cells with Pipeline Operations
From MaRDI portal
Recommendations
Cited in
(8)- Combinatorial optimization models for production scheduling in automated manufacturing systems
- On an optimization problem occurring in FMSs: A hypergraph-theoretical formulation
- Open shop scheduling with some additional constraints
- Performance evaluation of a flexible manufacturing cell with random multiproduct feedback flow
- Analysis of operating policies for manufacturing cells
- Some simple, but efficient, push and pull heuristics for production sequencing for certain flexible manufacturing systems
- Design for Synchronized Flow Manufacturing
- Throughput optimization in two-machine flowshops with flexible operations
This page was built for publication: Flow Management in Flexible Manufacturing Cells with Pipeline Operations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5285751)