Throughput optimization in two-machine flowshops with flexible operations
From MaRDI portal
Publication:983633
DOI10.1007/S10951-008-0096-2zbMATH Open1193.90096OpenAlexW2033901094MaRDI QIDQ983633FDOQ983633
Authors: Hakan Gultekin, Yves Crama
Publication date: 24 July 2010
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-008-0096-2
Recommendations
- Two-machine flowshop scheduling with flexible operations and controllable processing times
- scientific article; zbMATH DE number 4130175
- Batch scheduling in a two-stage flexible flow shop problem
- Flow Management in Flexible Manufacturing Cells with Pipeline Operations
- Scheduling alternative operations in two-machine flow-shops
Cites Work
- A classification of assembly line balancing problems
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- A survey on problems and methods in generalized assembly line balancing
- Optimal two- and three-stage production schedules with set-up time included
- Production planning problems in printed circuit board assembly
- Title not available (Why is that?)
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Dynamic task assignment for throughput maximization with worksharing
- A framework for the complexity of high-multiplicity scheduling problems
- Flow shop scheduling with partial resource flexibility
- A Production Line that Balances Itself
- Multiplicity and complexity issues in contemporary production scheduling
- Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
- Design and operation of dynamic assembly lines using work-sharing
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Flow Shop Scheduling with Resource Flexibility
- A tabu-search heuristic for the flexible-resource flow shop scheduling problem
- Cyclic scheduling of a 2-machine robotic cell with tooling constraints
Cited In (10)
- Flow Management in Flexible Manufacturing Cells with Pipeline Operations
- Maximizing total early work in a distributed two‐machine flow‐shop
- Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption
- Configuring flexible flowlines
- Shop scheduling problems with pliable jobs
- Optimal lot streaming for multiple products in a two-machine flow shop
- No-wait two-stage flowshop problem with multi-task flexibility of the first machine
- Two-stage proportionate flexible flow shop to minimize the makespan
- Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence
- Exact solution of the two-machine flow shop problem with three operations
This page was built for publication: Throughput optimization in two-machine flowshops with flexible operations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q983633)