Throughput optimization in two-machine flowshops with flexible operations
From MaRDI portal
Publication:983633
DOI10.1007/s10951-008-0096-2zbMath1193.90096OpenAlexW2033901094MaRDI QIDQ983633
Publication date: 24 July 2010
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-008-0096-2
Related Items (5)
Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption ⋮ Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence ⋮ Exact solution of the two-machine flow shop problem with three operations ⋮ Shop scheduling problems with pliable jobs ⋮ No-wait two-stage flowshop problem with multi-task flexibility of the first machine
Cites Work
- Unnamed Item
- Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
- Production planning problems in printed circuit board assembly
- A tabu-search heuristic for the flexible-resource flow shop scheduling problem
- A classification of assembly line balancing problems
- Cyclic scheduling of a 2-machine robotic cell with tooling constraints
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- A survey on problems and methods in generalized assembly line balancing
- Dynamic task assignment for throughput maximization with worksharing
- A framework for the complexity of high-multiplicity scheduling problems
- Optimal two- and three-stage production schedules with setup times included
- Flow Shop Scheduling with Partial Resource Flexibility
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Flow Shop Scheduling with Resource Flexibility
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines
- A Production Line that Balances Itself
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Design and operation of dynamic assembly lines using work-sharing
- Multiplicity and complexity issues in contemporary production scheduling
This page was built for publication: Throughput optimization in two-machine flowshops with flexible operations