Flow Shop Scheduling with Partial Resource Flexibility
From MaRDI portal
Publication:3114898
DOI10.1287/mnsc.1040.0209zbMath1232.90206OpenAlexW2013036518MaRDI QIDQ3114898
Richard L. Daniels, Dailun Shi, Joseph B. Mazzola
Publication date: 19 February 2012
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.1040.0209
Related Items (11)
Calibrating cross-training to meet demand mix variation and employee absence ⋮ A semi-online algorithm and its competitive analysis for parallel-machine scheduling problem with rejection ⋮ Optimization of the integrated problem of employee timetabling and job shop scheduling ⋮ Online scheduling with deterioration and unexpected processor breakdown ⋮ Process flexibility: design, evaluation, and applications ⋮ Throughput optimization in two-machine flowshops with flexible operations ⋮ Cross-training workers in Dual Resource Constrained systems with heterogeneous processing times ⋮ A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers ⋮ Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound ⋮ An optimal online algorithm for single-processor scheduling problem with learning effect ⋮ Production, maintenance and resource scheduling: a review
This page was built for publication: Flow Shop Scheduling with Partial Resource Flexibility