No-wait two-stage flowshop problem with multi-task flexibility of the first machine
From MaRDI portal
Publication:2054067
Recommendations
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
- scientific article; zbMATH DE number 6747350
- No-wait flexible flowshop scheduling with no-idle machines
- Approximation algorithms for two-stage flexible flow shop scheduling
- Improved approximation algorithms for two-stage flexible flow shop scheduling
Cites work
- A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
- A FPTAS for a two-stage hybrid flow shop problem and optimal algorithms for identical jobs
- A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness
- A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan
- A note on scheduling alternative operations in two-machine flowshops
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- A survey of scheduling problems with no-wait in process
- A two-stage semi-hybrid flowshop problem in graphics processing
- An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects
- COMPARISON OF SCHEDULING EFFICIENCY IN TWO/THREE-MACHINE NO-WAIT FLOW SHOP PROBLEM USING SIMULATED ANNEALING AND GENETIC ALGORITHM
- Complexity of flowshop scheduling problems with a new blocking constraint
- Complexity results and approximation algorithms for the two machine no-wait flow-shop with limited machine availability
- Cyclic scheduling in a robotic production line
- Flow-shop scheduling with flexible processors
- New heuristics for no-wait flowshops to minimize makespan.
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- On the Flow-Shop Sequencing Problem with No Wait in Process†
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling alternative operations in two-machine flow-shops
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- The Three-Machine No-Wait Flow Shop is NP-Complete
- Throughput optimization in two-machine flowshops with flexible operations
- Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption
- Two-machine no-wait flow shop scheduling with missing operations
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
Cited in
(2)
This page was built for publication: No-wait two-stage flowshop problem with multi-task flexibility of the first machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2054067)