Scheduling alternative operations in two-machine flow-shops
From MaRDI portal
Recommendations
- A note on scheduling alternative operations in two-machine flowshops
- Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling
- On two-machine flow shop scheduling
- Two-machine flowshop scheduling with flexible operations and controllable processing times
- Two-machine flowshop batching and scheduling
- Two-machine flowshop scheduling problem with coupled-operations
- Two-machine flowshop scheduling with a secondary criterion
- scientific article; zbMATH DE number 4093162
- Two-machine flow shop scheduling with nonregular criteria
- On scheduling multiple two-stage flowshops
Cited in
(17)- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- A study of the multi-stage flowshop scheduling problem with alternative operation assignments
- Throughput optimization in two-machine flowshops with flexible operations
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- scientific article; zbMATH DE number 4093162 (Why is no real title available?)
- Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests
- Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption
- No-wait two-stage flowshop problem with multi-task flexibility of the first machine
- AN OPTIMAL SEQUENCENING PROBLEM FOR A TWO-STAGE FLOW SHOP WITH ALTERNATIVE JOB ASSIGNMENTS
- TWO-MACHINE FLOW SHOP SCHEDULING WITH INDIVIDUAL OPERATION'S REJECTION
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- A note on scheduling alternative operations in two-machine flowshops
- Flow shop scheduling with inter-stage flexibility and blocking constraints
- Job shop scheduling with alternative machines
This page was built for publication: Scheduling alternative operations in two-machine flow-shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4347419)