scientific article; zbMATH DE number 6747350
From MaRDI portal
Publication:5282679
Recommendations
- Flow shop scheduling problems with transportation constraints revisited
- A note on the complexity of flow shop scheduling with transportation constraints
- A new formulation and solution of the flowshop scheduling problem with no in-process waiting
- Complexity of flow shop scheduling problems with transportation constraints
- A two-stage flow shop scheduling problem with transportation considerations
- Solvable Cases of the No-wait Flow-shop Scheduling Problem
- A flexible flowshop problem with total flow time minimization
- Flowshop scheduling with interstage job transportation
- Minimizing the makespan in the no-wait flexible flowshop problem with availability constraint
- No-wait flexible flowshop scheduling with no-idle machines
Cited in
(5)- Complexity results for flow-shop and open-shop scheduling problems with transportation delays
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
- No-wait flexible flowshop scheduling with no-idle machines
- No-wait two-stage flowshop problem with multi-task flexibility of the first machine
- A note on the complexity of flow shop scheduling with transportation constraints
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5282679)