Heuristic factory planning algorithm for advanced planning and scheduling
From MaRDI portal
Recommendations
- A heuristic algorithm for master planning that satisfies multiple objectives
- Multi-objective multi-factory scheduling
- Aggregate planning in hybrid flowshops
- A heuristic algorithm for a production planning problem in an assembly system
- Finite capacity scheduling using a predetermined placement sequence
Cites work
- scientific article; zbMATH DE number 5345854 (Why is no real title available?)
- scientific article; zbMATH DE number 47258 (Why is no real title available?)
- scientific article; zbMATH DE number 1271322 (Why is no real title available?)
- scientific article; zbMATH DE number 1488569 (Why is no real title available?)
- A 0-1 goal programming model for nurse scheduling
- A heuristic algorithm for master planning that satisfies multiple objectives
- A hierarchical decision support system for production planning (with case study)
- Aggregate planning and scheduling in the food industry: A case study
- Approximability of flow shop scheduling
- Case study based on a multi-period multi-criteria production planning model
- Heuristics for scheduling in a flow shop with multiple processors
- Local search algorithms for the multiprocessor flow shop scheduling problem
- Minimizing Total Tardiness on One Machine is NP-Hard
- Multi-plant production planning in capacitated self-configuring two-stage serial systems
- Real optimization with SAP\(^\circledR\) APO. With foreword by Gerard De Beuckelaer
Cited in
(5)- A constraint programming method for advanced planning and scheduling system with multilevel structured products
- Operational extended model formulations for advanced planning and scheduling systems
- Shop scheduling in manufacturing environments: a review
- A heuristic algorithm for master planning that satisfies multiple objectives
- A compaction scheme and generator for distribution networks
This page was built for publication: Heuristic factory planning algorithm for advanced planning and scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1010253)