How useful are preemptive schedules?
From MaRDI portal
Recommendations
- Preemptive and non-preemptive scheduling on two unrelated parallel machines
- Rational preemptive scheduling
- The power of preemption on unrelated machines and applications to scheduling orders
- The Power of Preemption on Unrelated Machines and Applications to Scheduling Orders
- On the Value of Preemption in Scheduling
Cites work
- Complexity results for scheduling chains on a single machine
- scientific article; zbMATH DE number 1634827 (Why is no real title available?)
- scientific article; zbMATH DE number 1757970 (Why is no real title available?)
- On preemption redundancy in scheduling unit processing time jobs on two parallel machines
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling chain-structured tasks to minimize makespan and mean flow time
- Scheduling with deadlines and loss functions
Cited in
(14)- Scheduling with job release dates, delivery times and preemption penalties
- Integer preemptive scheduling on parallel machines
- Discrete and continuous-time formulations for dealing with break periods: preemptive and non-preemptive scheduling
- Three notes on scheduling unit-length jobs with precedence constraints to minimize the total completion time
- The complexity of parallel machine scheduling of unit-processing-time jobs under level-order precedence constraints
- How small are shifts required in optimal preemptive schedules?
- Minimizing the weighted number of tardy jobs on multiple machines: a review
- A polynomial-time algorithm for the preemptive mixed-shop problem with two unit operations per job
- Integrality Property in Preemptive Parallel Machine Scheduling
- Preemptive scheduling in a two-stage supply chain to minimize the makespan
- Properties of optimal schedules in preemptive shop scheduling
- Unrelated parallel machine scheduling with random rework and limited preemption
- Preemptive scheduling with simple linear deterioration on a single machine
- Scheduling unit time jobs with integer release dates to minimize the weighted number of tardy jobs
This page was built for publication: How useful are preemptive schedules?
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1413904)