Complexity results for scheduling chains on a single machine
From MaRDI portal
Cites work
- scientific article; zbMATH DE number 3471786 (Why is no real title available?)
- scientific article; zbMATH DE number 3550186 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Complexity of Scheduling under Precedence Constraints
- Complexity results for scheduling chains on a single machine
- Computational Complexity of Discrete Optimization Problems
- On the Computational Complexity of Combinatorial Problems
- Optimal scheduling for two-processor systems
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling Tasks with Nonuniform Deadlines on Two Processors
- Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints
- `` Strong NP-Completeness Results
Cited in
(26)- Minimizing the number of tardy jobs with precedence constraints and agreeable due dates
- New heuristics for packing unequal circles into a circular container
- Two schemes of the branch-and-bound method for a flow shop total weighted tardiness minimization problem
- Single machine preemptive scheduling to minimize the weighted number of late jobs with deadlines and nested release/due date intervals
- A note on competing-agent Pareto-scheduling
- Open shop scheduling problems with late work criteria.
- A survey on how the structure of precedence constraints may change the complexity class of scheduling problems
- Single-machine scheduling with supporting tasks
- Packing cylinders and rectangular parallelepipeds with distances between them into a given region
- A metric approach for scheduling problems with minimizing the maximum penalty
- Approximate Deadline-Scheduling with Precedence Constraints
- A note on the maximum number of on-time jobs on parallel identical machines.
- Network construction problems with due dates
- How useful are preemptive schedules?
- On the complexity of generalized due date scheduling problems
- Complexity results for scheduling chains on a single machine
- A survey of single machine scheduling to minimize weighted number of tardy jobs
- Packing different-sized circles into a rectangular container
- The simple plant location problem: Survey and synthesis
- An improved algorithm for the packing of unequal circles within a larger containing circle
- On single-machine scheduling without intermediate delays
- Polyhedral results for position-based scheduling of chains on a single machine
- Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
- Single-machine scheduling of multiple projects with controllable processing times
- Equitable scheduling on a single machine
- On scheduling cycle shops: Classification, complexity and approximation
This page was built for publication: Complexity results for scheduling chains on a single machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1142687)