Integrated Production and Delivery Scheduling with Disjoint Windows
From MaRDI portal
fully polynomial time approximation schemesNP-hardparallel and identical machinesperishable goodssingle machinestrong NP-hard
Computational difficulty of problems (lower bounds, completeness, difficulty of approximation, etc.) (68Q17) Approximation algorithms (68W25) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Recommendations
- Integrated production and delivery scheduling with disjoint windows
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Integrated production and delivery on parallel batching machines
- Integrated production and batch delivery scheduling for perishable products
Cited in
(5)- Integrated production and outbound distribution scheduling problems with job release dates and deadlines
- Integrating release and dispatch policies in production models
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Integrated production and delivery scheduling with disjoint windows
This page was built for publication: Integrated Production and Delivery Scheduling with Disjoint Windows
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3637094)